The project involved the study, design, and preparation of contract documents for a 33-lot subdivision in the City of Hurricane, West Virginia.
Site design responsibilities included lot layout, grading, interior roadway and driveway design, pavement design, as well as the design of the storm water system, including storm water detention. Utility design included water and sanitary sewer design.
Additional design responsibilities included obtaining all permits, including N.P.D.E.S. permit, WV Health Department, and Putnam County Planning Commission permits.
Surveying services included topographic mapping for design purposes, survey plat development, and construction stakeout.
Highlights:
- Utility Design & Coordination
- Permitting
- Stormwater Management
- Survey and Mapping

