Project included the design and preparation of construction documents, specifications and construction administration
services for a system upgrade that consisted of more than 6000 L.F. of 6″ diameter water line and 3000 L.F. of 2″
diameter water line as well as fire hydrants, valves, and service line installation.
Additional responsibilities included right-of-way easements and coordination with existing utility companies and various review, emergency and permitting agencies.
Surveying services included topographic field mapping for system design as well as construction stakeout.

