Wastewater Treatment Plant

wasterwater treatment plant

Client:

City of Hurricane

Project Location:

Put

Status:

Completed 2006

Key Personnel:

Project Manager: Roger K. Randolph, P.E. Design Engineer: Roger K. Randolph, P.E. Aaron C. Randolph, P.E.

Project Description

In an effort to keep up with the current and anticipated future growth, the City of Hurricane contracted with Randolph Engineering to provide renovation and upgrade design services of the existing vertical loop reactor wastewater treatment plant.  The project would increase the maximum capacity of the plant from 3 MGD to 4.5 MGD.

Included in the project scope were the addition of two new aeration trains, one dual chamber digester, one new clarifier with plans for a second one, as well as a complete renovation of the pretreatment facility.  In addition to the upgrade of these facilities, the project required new line work, electrical upgrades for the entire plant, and general site upgrades.

Additional responsibilities involved preliminary studies, project permitting, coordination with various review and funding agencies, as well as elected officials and the general public.

Highlights:

  • Major Treatment Plant Upgrade
  • Site Improvements
  • Collection System Improvements
  • Electrical Upgrades
  • Stormwater Design
  • Permitting